Sistem Monitoring Hasil Produksi PT Rimbawana
Gunakan menu di sidebar sebelah kiri untuk navigasi modul.
DB: db_rimbawana

Data Referensi (Sanding P1)

Daftar referensi data Sanding P1

ID Sanding No. Pallet Tebal Lebar Panjang Grade Sisa Qty Aksi
639 815//785 2.40 915.00 1830.00 FM E1 UTY E 0 / 237
638 782//779 2.40 915.00 1830.00 FM E1 UTY E 0 / 286
637 778//782 2.40 915.00 1830.00 FM E1 UTY E 0 / 232
636 768//778 2.40 915.00 1830.00 FM E1 UTY E 0 / 264
635 751 2.40 915.00 1830.00 FM E1 UTY E 0 / 222
634 904//757 2.40 915.00 1830.00 FM E1 UTY E 0 / 260
633 904 2.40 915.00 1830.00 FM E1 UTY E 0 / 240
632 583 11.20 1220.00 2440.00 FM E1 BB CC 0 / 40
631 732 11.20 1220.00 2440.00 FM E1 BB CC 0 / 43
630 709 30.00 1220.00 2440.00 FM PENOL MAHONI 9 / 9

Form Input Check P1

Silakan isi data dengan lengkap dan benar

1. Data Referensi Sanding P1
2. Data Input Check P1

Rekap Data Check P1

Daftar riwayat dan rekapitulasi data hasil check P1

ID Check ID Sanding Tanggal Mo/Wk No. Pallet Shift Meja Dimensi (T x L x P) Grade Qty Check PTS / Bagus Out / Bal M3/Pcs Total M3 Aksi
138 121 2026-09-02 M:September / W:36 234 Shift A P1.CU.8 18.00 x 1220.00 x 2440.00 FM E2 LKL C11 7 23 P:0 / B:23 O:0 / B:23 0.050606 1.163929 Del
137 120 2026-09-03 M:September / W:36 999 Shift A P1.CU.1 6.00 x 1220.00 x 2440.00 FA E2 BB CC 100 P:0 / B:100 O:0 / B:100 0.014884 1.488400 Del
136 119 2026-09-01 M:September / W:36 136 Shift A P1.CU.1 2.40 x 915.00 x 1830.00 FM E1 UTY E 200 P:0 / B:200 O:0 / B:200 0.003181 0.636291 Del
135 118 2026-09-01 M:September / W:36 111 Shift A P1.CU.1 2.40 x 915.00 x 1830.00 FM E1 UTY E 200 P:2 / B:198 O:0 / B:198 0.003181 0.636291 Del
134 117 2026-09-01 M:September / W:36 114 Shift A P1.CU.2 2.40 x 915.00 x 1830.00 FM E1 UTY E 200 P:5 / B:195 O:0 / B:195 0.003181 0.636291 Del
133 116 2026-09-01 M:September / W:36 106 Shift A P1.CU.1 2.40 x 915.00 x 1830.00 FM E1 UTY E 200 P:0 / B:200 O:0 / B:200 0.003181 0.636291 Del
132 115 2026-09-01 M:September / W:36 107 Shift A P1.CU.1 2.40 x 915.00 x 1830.00 FM E1 UTY E 200 P:0 / B:200 O:0 / B:200 0.003181 0.636291 Del
131 114 2026-09-01 M:September / W:36 129 Shift A P1.CU.1 2.40 x 915.00 x 1830.00 FM E1 UTY E 200 P:8 / B:192 O:0 / B:192 0.003181 0.636291 Del
130 113 2026-09-01 M:September / W:36 8309 Shift B P1.CU.1 3.70 x 1220.00 x 2440.00 FM B4 G1 200 P:3 / B:197 O:0 / B:197 0.009526 1.905152 Del
129 112 2026-09-01 M:September / W:36 8303 Shift B P1.CU.1 3.70 x 1220.00 x 2440.00 FM B4 G1 200 P:0 / B:200 O:0 / B:200 0.009526 1.905152 Del