Sistem Monitoring Hasil Produksi PT Rimbawana
Gunakan menu di sidebar sebelah kiri untuk navigasi modul.
DB: db_rimbawana

Data Referensi (Sanding P1)

Daftar referensi data Sanding P1

ID Sanding No. Pallet Tebal Lebar Panjang Grade Sisa Qty Aksi
639 815//785 2.40 915.00 1830.00 FM E1 UTY E 0 / 237
638 782//779 2.40 915.00 1830.00 FM E1 UTY E 0 / 286
637 778//782 2.40 915.00 1830.00 FM E1 UTY E 0 / 232
636 768//778 2.40 915.00 1830.00 FM E1 UTY E 0 / 264
635 751 2.40 915.00 1830.00 FM E1 UTY E 0 / 222
634 904//757 2.40 915.00 1830.00 FM E1 UTY E 0 / 260
633 904 2.40 915.00 1830.00 FM E1 UTY E 0 / 240
632 583 11.20 1220.00 2440.00 FM E1 BB CC 0 / 40
631 732 11.20 1220.00 2440.00 FM E1 BB CC 0 / 43
630 709 30.00 1220.00 2440.00 FM PENOL MAHONI 9 / 9

Form Input Check P1

Silakan isi data dengan lengkap dan benar

1. Data Referensi Sanding P1
2. Data Input Check P1

Rekap Data Check P1

Daftar riwayat dan rekapitulasi data hasil check P1

ID Check ID Sanding Tanggal Mo/Wk No. Pallet Shift Meja Dimensi (T x L x P) Grade Qty Check PTS / Bagus Out / Bal M3/Pcs Total M3 Aksi
128 111 2026-09-01 M:September / W:36 8349 Shift A P1.CU.2 3.70 x 1220.00 x 2440.00 FM B4 G1 200 P:2 / B:198 O:0 / B:198 0.009526 1.905152 Del
127 110 2026-09-01 M:September / W:36 383 Shift B P1.CU.2 11.60 x 1230.00 x 2440.00 FA B4 G2 62 P:0 / B:62 O:0 / B:62 0.031813 1.972389 Del
126 109 2026-09-01 M:September / W:36 284 Shift A P1.CU.1 11.60 x 910.00 x 1820.00 FA B4 G2 60 P:0 / B:60 O:0 / B:60 0.017556 1.053343 Del
125 108 2026-09-01 M:September / W:36 285 Shift A P1.CU.2 11.60 x 910.00 x 1820.00 FA B4 G2 60 P:0 / B:60 O:0 / B:60 0.017556 1.053343 Del
124 107 2026-09-01 M:September / W:36 297 Shift A P1.CU.1 14.60 x 920.00 x 1830.00 MA B4 G1 30 P:0 / B:30 O:0 / B:30 0.022897 0.686909 Del
123 106 2026-09-01 M:September / W:36 298 Shift B P1.CU.2 14.60 x 920.00 x 1830.00 MA B4 G1 52 P:0 / B:52 O:0 / B:52 0.022897 1.190642 Del
122 105 2026-09-01 M:September / W:36 251/237 Shift A P1.CU.1 14.60 x 920.00 x 1830.00 MA B4 G1 33 P:0 / B:33 O:0 / B:33 0.022897 0.755600 Del
121 104 2026-09-01 M:September / W:36 251 Shift A P1.CU.1 14.60 x 920.00 x 1830.00 MA B4 G1 50 P:0 / B:50 O:0 / B:50 0.022897 1.144848 Del
120 103 2026-09-01 M:September / W:36 371 Shift A P1.CU.1 14.60 x 920.00 x 1830.00 MA B4 G1 50 P:0 / B:50 O:0 / B:50 0.022897 1.144848 Del
119 102 2026-09-01 M:September / W:36 382 Shift A P1.CU.2 15.00 x 1220.00 x 2440.00 FA B4 CI 17 22 P:0 / B:22 O:0 / B:22 0.041675 0.916854 Del