Data Referensi (Sanding P1)
Daftar referensi data Sanding P1
| ID Sanding | No. Pallet | Tebal | Lebar | Panjang | Grade | Sisa Qty | Aksi |
|---|---|---|---|---|---|---|---|
| 396 | 663 | 2.70 | 1220.00 | 2440.00 | FA E1 UTY | 0 / 204 | |
| 395 | 623 | 2.70 | 1220.00 | 2440.00 | FA E1 UTY | 0 / 202 | |
| 394 | 658 | 2.70 | 1220.00 | 2440.00 | FA E1 UTY | 0 / 204 | |
| 393 | 616 | 11.60 | 915.00 | 1830.00 | FA B4 G2 | 0 / 55 | |
| 392 | 612 | 11.60 | 915.00 | 1830.00 | FA B4 G2 | 0 / 50 | |
| 391 | 617 | 11.60 | 915.00 | 1830.00 | FA B4 G2 | 0 / 62 | |
| 390 | 530 | 20.50 | 1220.00 | 2440.00 | MA B4 G1 | 0 / 18 | |
| 389 | x | 11.20 | 1220.00 | 2440.00 | FM E1 BB CC | 0 / 12 | |
| 388 | 105 | 11.20 | 1220.00 | 2440.00 | FM E1 BB CC | 0 / 40 | |
| 387 | 579 | 11.20 | 1220.00 | 2440.00 | FM E1 BB CC | 0 / 45 |
Form Input Check P1
Silakan isi data dengan lengkap dan benar
Rekap Data Check P1
Daftar riwayat dan rekapitulasi data hasil check P1
| ID Check | ID Sanding | Tanggal | Mo/Wk | No. Pallet | Shift | Meja | Dimensi (T x L x P) | Grade | Qty Check | PTS / Bagus | Out / Bal | M3/Pcs | Total M3 | Aksi |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 142 | 125 | 2026-08-31 | M:Agustus / W:36 | 387 | Shift B | P1.CU.2 | 11.60 x 915.00 x 1830.00 | MA B4 G1 | 60 | P:0 / B:60 | O:0 / B:60 | 0.017749 | 1.064950 | Del |
| 141 | 124 | 2026-09-01 | M:September / W:36 | 50 | Shift B | P1.CU.1 | 11.60 x 915.00 x 1830.00 | MA B4 G1 | 60 | P:0 / B:60 | O:0 / B:60 | 0.017749 | 1.064950 | Del |
| 140 | 123 | 2026-09-01 | M:September / W:36 | 375 | Shift A | P1.CU.1 | 11.60 x 915.00 x 1830.00 | MA B4 G1 | 60 | P:0 / B:60 | O:0 / B:60 | 0.017749 | 1.064950 | Del |
| 139 | 122 | 2026-09-01 | M:September / W:36 | 230 | Shift A | P1.CU.2 | 18.00 x 1220.00 x 2440.00 | FM E2 LKL C11 7 | 19 | P:0 / B:19 | O:0 / B:19 | 0.050606 | 0.961506 | Del |
| 138 | 121 | 2026-09-02 | M:September / W:36 | 234 | Shift A | P1.CU.8 | 18.00 x 1220.00 x 2440.00 | FM E2 LKL C11 7 | 23 | P:0 / B:23 | O:0 / B:23 | 0.050606 | 1.163929 | Del |
| 137 | 120 | 2026-09-03 | M:September / W:36 | 999 | Shift A | P1.CU.1 | 6.00 x 1220.00 x 2440.00 | FA E2 BB CC | 100 | P:0 / B:100 | O:0 / B:100 | 0.014884 | 1.488400 | Del |
| 136 | 119 | 2026-09-01 | M:September / W:36 | 136 | Shift A | P1.CU.1 | 2.40 x 915.00 x 1830.00 | FM E1 UTY E | 200 | P:0 / B:200 | O:0 / B:200 | 0.003181 | 0.636291 | Del |
| 135 | 118 | 2026-09-01 | M:September / W:36 | 111 | Shift A | P1.CU.1 | 2.40 x 915.00 x 1830.00 | FM E1 UTY E | 200 | P:2 / B:198 | O:0 / B:198 | 0.003181 | 0.636291 | Del |
| 134 | 117 | 2026-09-01 | M:September / W:36 | 114 | Shift A | P1.CU.2 | 2.40 x 915.00 x 1830.00 | FM E1 UTY E | 200 | P:5 / B:195 | O:0 / B:195 | 0.003181 | 0.636291 | Del |
| 133 | 116 | 2026-09-01 | M:September / W:36 | 106 | Shift A | P1.CU.1 | 2.40 x 915.00 x 1830.00 | FM E1 UTY E | 200 | P:0 / B:200 | O:0 / B:200 | 0.003181 | 0.636291 | Del |