Sistem Monitoring Hasil Produksi PT Rimbawana
Gunakan menu di sidebar sebelah kiri untuk navigasi modul.
Tambah Data DB: db_rimbawana

Data Referensi (Sanding P2)

Daftar referensi data Sanding P2

ID Sanding No. Pallet Tebal Lebar Panjang Grade Sisa Qty Aksi
414 638 18.00 1220.00 2440.00 FA B4 BB CC 0 / 34
413 588 18.00 1220.00 2440.00 FA B4 BB CC 0 / 35
412 x//861 11.60 915.00 1830.00 FA B4 G2 60 / 60
411 613 11.60 915.00 1830.00 FA B4 G2 0 / 60
410 585 18.00 1220.00 2440.00 FA B4 BB CC 31 / 31
409 661 11.60 1220.00 2440.00 MA B4 G1 0 / 45
408 652 11.60 1220.00 2440.00 MA B4 G1 0 / 48
407 586 18.00 1220.00 2440.00 FA B4 BB CC 0 / 32
406 668 18.00 1220.00 2440.00 FA B4 BB CC 0 / 41
405 509 2.70 1220.00 2440.00 FA E1 UTY 0 / 200
Total: 521 data
< Prev Halaman 15 dari 53 Next >

Form Input Grading P2

Silakan isi data dengan lengkap dan benar

1. Data Referensi Sanding P2
2. Data Input Grading P2

Rekap Data Grading P2

Daftar riwayat dan rekapitulasi data hasil grading P2

ID Grading ID Sanding Tanggal Mo/Wk No. Pallet Shift Meja Dimensi (T x L x P) Grade Qty Grading PTS / Bagus Out / Bal M3/Pcs Total M3 Aksi
526 312 2026-09-16 M:9 / W:38 722 Shift B P2.CU.2 14.60 x 915.00 x 1830.00 MA B4 G1 42 P:0 / B:42 O:0 / B:0 0.022773 0.956446 Del
524 451 2026-09-16 M:9 / W:38 662 Shift B P2.CU.2 5.00 x 915.00 x 1830.00 FM E2 LKL C11 7 46 P:0 / B:46 O:0 / B:0 0.006698 0.308099 Del
523 450 2026-09-16 M:9 / W:38 838 Shift B P2.CU.5 2.70 x 1220.00 x 2440.00 FA E1 UTY 56 P:8 / B:48 O:0 / B:144 0.006549 0.366742 Del
522 449 2026-09-16 M:9 / W:38 816 Shift B P2.CU.2 2.70 x 1220.00 x 2440.00 FA E1 UTY 258 P:84 / B:174 O:0 / B:0 0.006549 1.689632 Del
520 447 2026-09-16 M:9 / W:38 799 Shift B P2.CU.2 15.00 x 1220.00 x 2440.00 FA B4 CI 17 6 P:0 / B:6 O:0 / B:44 0.041675 0.250051 Del
519 446 2026-09-16 M:9 / W:38 827 Shift B P2.CU.2 2.40 x 1220.00 x 2440.00 FA E1 UTY E 242 P:121 / B:121 O:0 / B:0 0.005656 1.368733 Del
518 429 2026-09-16 M:9 / W:38 775 Shift B P2.CU.6 15.00 x 920.00 x 2440.00 FA B4 CI 17 38 P:2 / B:36 O:0 / B:12 0.031427 1.194234 Del
517 444 2026-09-16 M:9 / W:38 837 Shift B P2.CU.5 2.70 x 1220.00 x 2440.00 FA E1 UTY 130 P:38 / B:92 O:0 / B:0 0.006549 0.851365 Del
516 443 2026-09-16 M:9 / W:38 828 Shift B P2.CU.2 2.70 x 1220.00 x 2440.00 FA E1 UTY 200 P:84 / B:116 O:0 / B:0 0.006549 1.309792 Del
515 442 2026-09-16 M:9 / W:38 545 Shift B P2.CU.2 15.00 x 1220.00 x 2440.00 FA B4 BB CC 43 P:0 / B:43 O:0 / B:0 0.041675 1.792034 Del